• The building has been designed for Sunderland City Council the Red Box Design
Group
• 11 huge timber beams - each weighing several tonnes and measuring half the
length of a football pitch, support the roof structure
• The gluelam beams were made by the specialist firm Wiehag, who are the
market leaders in engineered timber constructions
• Its construction has required 5100 cubic metres of concrete and 225,483
tiles
• Both the main pool and multi-purpose pool have moveable floors allowing
their depths to be varied so that they can accommodate a range of activities
from aqua aerobics to water polo, enabling swimmers of all abilities to use them
• The main pool also has a moveable boom, which can be used to alter its
length or sub-divide it, allowing more than one group of swimmers to use it at
the same time